Bell Creek Bridge Rehabilitation

Property Location:
Old Highway 2

Address:
3928 Old Highway 2, Belleville

Estimate:
$490,000

Status:
Currently under construction


Project Manager

Name:
Barry Simpson

Email:
construction@city.belleville.on.ca


Project Details

Based on 2014 inspections this structure was identified as the city's highest priority structure, (of those not being studied or worked on).  The work under this contract will consist of replacing the barrier system, repairing undermining below the approach curb and gutter, replacement of hazard signs, replacement of the approach guiderail and road resurfacing within the approximate 100 metre project limits to extend the service life of the structure.

Bell Creek COnstruction Notice, please click here