Catharine Street Pedestrian Bridge Replacement

Property Location:
East of the Catharine Street and Coleman Street Intersection Over the Moira River

Estimate:
$2,500,000

Completion:
2019

Status:
Design has been finalized. Awaiting environmental approvals to allow a construction contract to be tendered in 2018.


Project Manager

Name:
Barry Simpson

Email:
bsimpson@city.belleville.on.ca


Project Details

The existing Catharine Street Footbridge will be replaced with a new wider structure capable of accommodating pedestrians, cyclist and light service vehicles and will include a viewing platform at midspan and decorative LED lighting. 


Project Files

General arrangement drawings and digital renderings.