logo


Alexander & Forin Street Sewer Separation

Property Location:
Forin Street, (George St. to Charles St.) Alexander Street, (John St. to Charles St.)

Address:
20-38 Forin Street, Belleville

Status:
Currently in design phase

Email:
eds.construction@city.belleville.on.ca


Project Details

Presently, there are no storm sewers on these streets, and storm water is directed to the sanitary sewer system. A new storm sewer will be constructed to remove the stormwater from the sanitary sewer. The project will include: Replacement of the sanitary system; replacement of the watermains; new storm sewers; new  road surface including curbs and gutter.

Copyright 2017 City of Belleville. All Rights Reserved. Site by They.