The Project | ||||||||||||||
The Albion Street and Albion Way (henceforth referred to as Albion Street) Road Reconstruction, Watermain and Sewer Improvements project is set to replace and renew the City’s underground services on the two streets, reconstruct the sidewalk and incorporate bike lanes in the roadway. The project will provide a new roadway and underground infrastructure, both of which are currently nearing the end of their service life. |
||||||||||||||
Project Details | ||||||||||||||
The Albion Street road surface has deteriorated beyond the point where it could be resurfaced and a complete reconstruction design with new curb and gutters and sidewalk is being completed. The existing sanitary sewer, installed in 1966, will be replaced and the watermain, originally installed in 1910 and has a history of breaking, will be replaced. Stormwater is currently directed by asphalt swales from the south end of the street northward towards Station Street. It is proposed that these swales be removed and new underground storm sewers installed. A wider, 1.5 m sidewalk is proposed for the east-side of the street, in compliance with the Accessibility for Ontarians with Disabilities Act (AODA).
This road is a part of the City's on-road cycling network and is currently designated as a cycle route; appropriate cycling facilities, in the form of on-road bicycle lanes are being incorporated into the design. It is expected the road reconstruction will take place in 20 Project Drawings, including impacts to lots, can be found here. Project Line Painting drawings can be found here. |
||||||||||||||
The Benefits | ||||||||||||||
The project will provide significant benefits to all water, wastewater and road users on the street;
|
||||||||||||||
Construction Impacts | ||||||||||||||
Efforts will be made to ensure there is minimal impact to local residences; however, there will be temporary lane closures and temporary impacts to driveways. Driveway impacts will be communicated to individual residents by the contractor. Your patience in this matter is appreciated. | ||||||||||||||
On-Street Parking Impacts | ||||||||||||||
Street parking is governed under the City’s Traffic By-Law, 12967.
Currently, the By-Law notes that street parking is prohibited on the west-side of the street from Pine Street to a point opposite the south property line at No. 37 Albion Street It is proposed that parking be prohibited at all times along both sides of the street from the Albion Way & Station Street intersection to the Albion Street & Pine Street intersection in order to create space for bicycle lanes and accommodate safe cycle traffic. |
||||||||||||||
The Cost | ||||||||||||||
The project budget for this project is $3.60 million. | ||||||||||||||
The Project Schedule | ||||||||||||||
City Council has approved construction funding for this project to proceed in 2022. The project timeline is expected to be:
|
||||||||||||||
Frequently Asked Questions | ||||||||||||||
|
Provide your Input!
Residents are invited to provide project comments in the form below.
Residents are encouraged to provide comments by December 23rd, 2021. The City’s Project staff will review and respond to all Comment Form submissions.
What happens next?
Thank you for your interest in this project.